As we know, the Tasnim Uddin Building was changed into a day care in 2012. Unfortunately, the day care program was not able to reach the success we had anticipated. Alhumdulillah in the same year the full-time school was started. By the Grace of Allah it has been growing since the first year. A decision was made to use both buildings for the full-time school. MashaAllah now both buildings are becoming crowded. We thank Allah for giving us more than we deserve.
Recently, the fire department has asked to change the occupancy of the TU Building from day care to education. This requires several changes in the building. Although most of them are minor, the addition of a faculty bathroom is a major change that is required. This is an ongoing project, which might be handed over to a general contractor to save time. Some of the plans and estimates are included in the links below.
The estimated cost of the bathroom project right now is $17,450.
Recently, the fire department has asked to change the occupancy of the TU Building from day care to education. This requires several changes in the building. Although most of them are minor, the addition of a faculty bathroom is a major change that is required. This is an ongoing project, which might be handed over to a general contractor to save time. Some of the plans and estimates are included in the links below.
The estimated cost of the bathroom project right now is $17,450.